Abstract
The rapid deployment of all-weather connected transportation networks promises unprecedented gains in mobility efficiency, automated traffic coordination, and asset utilization, yet these ambitions remain acutely vulnerable to the coupled dynamics of environmental degradation, radio-frequency (RF) telemetry instability, and fiscal overexposure. When physical infrastructure and connected vehicles operate across severe meteorological regimes, ranging from heavy precipitation and thermal cycling to ultraviolet-induced material aging, electromagnetic propagation pathways and hardware transceivers experience progressive attenuation that quietly undermines upper-layer algorithmic governance. Drawing upon interdisciplinary insights spanning extreme-environment wireless instrumentation, vehicular electromagnetic compatibility, multi-physics structural glazing, and engineering-accounting fiscal governance, this study investigates how physical-layer telemetry decay propagates into systemic capital inefficiencies and budget overruns in public-private mobility deployments. Through an iterative, multi-stage empirical and architectural inquiry that confronted substantial calibration anomalies and sensor-fusion discrepancies during field-condition emulations, our analysis reveals that conventional decoupled management frameworks systematically underestimate tail-end fiscal risks caused by intermittent telemetry blind spots. Rather than attributing financial vulnerabilities solely to macroscopic procurement delays or isolated hardware faults, the findings suggest that tightly coupled hardware-financial monitoring protocols, adaptive signal-processing architectures, and ecological-electromagnetic compliance mechanisms are essential, though further research is needed to validate long-term institutional scalability across diverse climatic and regulatory jurisdictions.

This work is licensed under a Creative Commons Attribution 4.0 International License.
Copyright (c) 2026 Elena Vance (Author)